76
Download Previous Year Diploma Paper of Public Health & Irrigation Engineering Drawing PHIED 4th Sem/Civil/0513/May 2009 Diploma Paper
PUBLIC HEALTH & IRRIGATION ENGINEERING DRAWING 4th Exam/Civil/0513/May’09
Duration: 4Hrs. M.Marks:100
Note: Attempt any FOUR questions.Assume the dimensions .First Question is Compulsorily
SECTION-A
Q1. Draw the detailed plan the section of a deep man hole. 40
Draw the detailed x- section through external wall of lavatories at ground and first floor level showing two pipe system.
Q2. Draw a section of floor trap. 20
Q3. Draw section of a semi circular open drain. 20
Q4. Draw a section of an empty soak pit. 20
Q5. Draw the section of gully trap. 20
SECTION-B
Q6. Draw the detailed plan of canal head works.
Q7. Draw the cross-section of strainer type tube-well.
Q8. Draw the X-section of zoned type earthen dam.
Q9. Draw the L-section of lined channel section in full filling.
Q10. Draw the cross-section of semi circular and U-shaped open drain with its foundation
Get Started
Draw the detailed plan the section of a deep man hole.Draw the detailed plan the section of a deep man hole.
Draw the detailed x- section through external wall of lavatories at ground and first floor level showing two pipe system.Draw the detailed x- section through external wall of lavatories at ground and first floor level showing two pipe system.
Draw a section of floor trap.Draw a section of floor trap.
Draw section of a semi circular open drain. Draw section of a semi circular open drain.
Draw a section of an empty soak pit. Draw a section of an empty soak pit.
Draw the section of gully trap.Draw the section of gully trap.
PHIED 4th Sem/Civil/0513/May 2009 Diploma Paper Click Here
Draw the detailed plan of canal head works.Draw the detailed plan of canal head works.
Draw the cross-section of strainer type tube-well.Draw the cross-section of strainer type tube-well.
Draw the X-section of zoned type earthen dam.Draw the X-section of zoned type earthen dam.
Draw the L-section of lined channel section in full filling.Draw the L-section of lined channel section in full filling.
Draw the cross-section of semi circular and U-shaped open drain with its foundation.Draw the cross-section of semi circular and U-shaped open drain with its foundation.
PHIED 4th Sem/Civil/0513/May 2009 Diploma Paper Click Here
PHIED 4th Sem/Civil
/0513/May 2009 Diploma Paper
Get Started
https://www.youtube.com/watch?v=UHX6f8TIvX8https://www.youtube.com/watch?v=M_RR6LVICp0https://www.youtube.com/watch?v=mV41CMWonN4https://www.youtube.com/watch?v=s0LVPE0Q3LE&list=PLA9Q9SDZ781WXNAWit379A4CRLMvjGiUw&index=14&t=0s
MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering

JK SMART CLASSES
ER.JASWINDER KUMAR

JK SMART LECTURE
ER.JASWINDER KUMAR
Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering

ENGINEERING CLASSES
ER.JASWINDER KUMAR

er.jaswinder kumar
Senior Lecturer